docs: park post-attendance-flow-v2 (designed+planned, execution paused)
Konrad paused execution. parked-work.md now has a "⏸ Paused — ready to execute" section pointing at the design (110545b) + plan (29c36be) commits, with the resume instruction and the hard-stop constraint. All 3 commits are local-only on ai-dev — nothing pushed until Konrad verifies the flow locally.
This commit is contained in:
parent
29c36bede7
commit
9713b89ede
@ -7,6 +7,34 @@
|
|||||||
|
|
||||||
---
|
---
|
||||||
|
|
||||||
|
## ⏸ Paused — ready to execute (not started, not pushed)
|
||||||
|
|
||||||
|
### Post-Attendance Flow v2
|
||||||
|
|
||||||
|
**Status:** Brainstormed + designed + planned, **approved by Konrad**,
|
||||||
|
execution paused (Konrad's call, 15 May 2026). Design doc
|
||||||
|
`docs/plans/2026-05-15-post-attendance-flow-v2-design.md` (local
|
||||||
|
commit `110545b`), plan `docs/plans/2026-05-15-post-attendance-flow-v2-plan.md`
|
||||||
|
(local commit `29c36be`). **These 2 commits are local-only on
|
||||||
|
`ai-dev`, NOT pushed to origin** — Konrad wants nothing reaching the
|
||||||
|
working app until he's verified the flow locally.
|
||||||
|
|
||||||
|
**What it does:** Replaces the forced post-attendance SiteReport
|
||||||
|
redirect with 3 explicit buttons (Log Work → dashboard / + Site
|
||||||
|
Journal / + Absences) + a "Save Site Journal + Add Absences" button
|
||||||
|
on the journal page. Renames user-facing "Site Report" → "Site
|
||||||
|
Journal" (display-only, Path-A — frees "Journal" for the parked
|
||||||
|
voice feature, which must now be called "Voice Notes").
|
||||||
|
|
||||||
|
**To resume:** new or same session → "execute the
|
||||||
|
post-attendance-flow-v2 plan". 4 tiny TDD tasks (~120 LOC), reuses
|
||||||
|
the proven Round C `next_action` pattern. **HARD STOP after Task 4
|
||||||
|
— Konrad runs the manual verification checklist (in the design doc)
|
||||||
|
locally and explicitly approves BEFORE any push.** No migrations /
|
||||||
|
collectstatic — pure template + view change.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
## Production status — ✅ fully caught up (15 May 2026)
|
## Production status — ✅ fully caught up (15 May 2026)
|
||||||
|
|
||||||
Production (`https://foxlog.flatlogic.app/`) is deployed at
|
Production (`https://foxlog.flatlogic.app/`) is deployed at
|
||||||
|
|||||||
Loading…
x
Reference in New Issue
Block a user