diff --git a/assets/pasted-20251220-225655-18e53e0d.png b/assets/pasted-20251220-225655-18e53e0d.png new file mode 100644 index 0000000..0c2e36d Binary files /dev/null and b/assets/pasted-20251220-225655-18e53e0d.png differ diff --git a/assets/pasted-20251220-225752-dc0ee56c.png b/assets/pasted-20251220-225752-dc0ee56c.png new file mode 100644 index 0000000..bfb6616 Binary files /dev/null and b/assets/pasted-20251220-225752-dc0ee56c.png differ diff --git a/assets/pasted-20251220-230034-a785e7e2.png b/assets/pasted-20251220-230034-a785e7e2.png new file mode 100644 index 0000000..98c67fc Binary files /dev/null and b/assets/pasted-20251220-230034-a785e7e2.png differ diff --git a/assets/pasted-20251220-230458-7abed009.webp b/assets/pasted-20251220-230458-7abed009.webp new file mode 100644 index 0000000..274a6c5 Binary files /dev/null and b/assets/pasted-20251220-230458-7abed009.webp differ diff --git a/config/__pycache__/urls.cpython-311.pyc b/config/__pycache__/urls.cpython-311.pyc index 28817aa..3a835d0 100644 Binary files a/config/__pycache__/urls.cpython-311.pyc and b/config/__pycache__/urls.cpython-311.pyc differ diff --git a/core/__pycache__/urls.cpython-311.pyc b/core/__pycache__/urls.cpython-311.pyc index dd03437..06a2993 100644 Binary files a/core/__pycache__/urls.cpython-311.pyc and b/core/__pycache__/urls.cpython-311.pyc differ diff --git a/core/__pycache__/views.cpython-311.pyc b/core/__pycache__/views.cpython-311.pyc index 8c6495b..baf835c 100644 Binary files a/core/__pycache__/views.cpython-311.pyc and b/core/__pycache__/views.cpython-311.pyc differ diff --git a/core/templates/core/index.html b/core/templates/core/index.html index 3da5fd8..bed228b 100644 --- a/core/templates/core/index.html +++ b/core/templates/core/index.html @@ -1,147 +1,188 @@ {% extends 'base.html' %} {% load static %} -{% block title %}ComplianceShield — Construction Compliance, Made Simple{% endblock %} +{% block title %}ComplianceShield — Portal{% endblock %} {% block content %} - - - -
-
- -
CS
-
ComplianceShield
- -
- - - -
- - Start Free Trial - -
-
- - - -
- -
- - -
-
-
-
- - Trusted by contractors & project managers -
- -

- Construction compliance,
made simple. -

- -

- Track daily logs, manage OSHA documentation, monitor equipment maintenance, - and keep subcontractors compliant — with a portal that looks premium and works in the field. -

- - - -
- Daily activity logs - Document expiration alerts - Safety meetings - Audit-ready exports -
- -
-
“Expensive” look, operational outcomes
-
- Field teams move faster. Managers see risk instantly. Owners stay audit-ready. -
-
-
- - -
-
-
-
Portal Snapshot
- Live-style UI -
- -
-
-
Ongoing Projects
-
08
-
+3.0% from last month
-
-
-
Alerts
-
03
-
2 expiring documents
-
-
- -
-
Alert Overview
-
-
- -
-
Safety incident report pending
-
Requires photos + supervisor review
-
-
-
- -
-
COI expiring in 7 days
-
Subcontractor: R. Builders LLC
-
-
-
-
-
-
-
-
- -
- - + body { + font-family: 'Inter', sans-serif; + color: var(--ink); + background-color: #f7f9fc; + } + .panel { + border-radius: var(--radius); + background: white; + border: 1px solid var(--line); + box-shadow: var(--shadow2); + } + .chip { + border-radius: 999px; + border: 1px solid var(--line); + background: #f8f9fa; + } + - -{% endblock %} +
+ + + + +
+
+

Dashboard

+ +
+ +
+
+
+

Habiganj 9746tr — Ongoing

+ Kukatata wt46tr +
+
+
+
Location
+
Dhaka, Bangladesh
+
+
+
Planned
+
$2.5M
+
+
+
Actual
+
$2.0M (-12%)
+
+
+
Progress
+
45%
+
+
+ +
+
+ + +
+

On-time: 92%

+
+
+
+
+
+
Docs Valid
+
Valid: 128 • Expiring: 7
+
+ Valid + Expiring +
+
+
+
+
Equipment
+
Maintenance due: 3
+ +
+
+
+ + +
+
+

Daily Activity Log

+
+ + +
+
+
+
+
+
+

Floor Slab

+

Project Manager — Eng. Rahim

+
+ Habiganj 9746tr — Ongoing +
+

Concrete pouring completed for 2nd floor slab

+
    +
  • Ensure rebar spacing matches BOQ specification.
  • +
  • Check curing process for foundation concrete.
  • +
  • Verify column alignment before pouring.
  • +
+
+ Sep 17, 2025 — 06:45 PM + 2 photos +
+
+ +
+
+
+

Safety Meeting

+

Supervisor — T. Coleman

+
+ Kukatata wt46tr — Ongoing +
+

Toolbox talk completed (PPE + ladder safety)

+
    +
  • Attendance captured with GPS check-in.
  • +
  • PPE checklist verified (helmets, vests).
  • +
  • Hazards documented with photo proof.
  • +
+
+ Sep 17, 2025 — 08:10 AM + Completed +
+
+
+
+
+
+
+{% endblock %} \ No newline at end of file